After experiencing days of uninterrupted power supply given the installation of the Geometric Power Plant, the Aba residents of Abia State have revealed their unending happiness and joy. This is even as they went online to celebrate since one out of four turbines at the plant was switched on on Sunday, February 25, 2024, and since then, some sections of Aba have been enjoying an uninterrupted power supply. Recall that on Monday, February, 26, President Bola Tinubu had launched the Geometric Power Plant in Aba. This is coming 20 years after the project was initiated by a former Minister of Power, Barth Nnaji. According to the State Governor, Alex Otti, the Geometric Power Plant project was as a result of the power to dream. He went ahead to say that with the power project in Aba, the city is now open for national and international businesses. Don’t Miss: Nigeria Customs Reveals How Much It Makes In Its Apapa Area Command Daily